Cadbury’s

Cadbury's Somerdale Factory, Keynsham


Bath Demolition were awarded the contract for the separation and demolition of D block at the former Cadbury’s Somerdale Factory Located in Keynsham.

The redundant 3 storey structure was of a steel frame construction with brick panel infill, the intermediate floors and roof were reinforced concrete, above existing ground level with a further partial 2-storey basement.

Following the demolition of the main structures utilising our high reach demolition machinery the basement void was propped and backfilled with the site won crushed demolition material. 100% of the demolished structure was either successfully reused on site or recycled.

Cadbury's demolition project

Completed: February 2014

Programme: 18 weeks

Accreditation
Accreditation
Accreditation
Accreditation
Accreditation
Accreditation
Accreditation
Accreditation
Accreditation

Areas Covered


Based in Bristol, Bath Demolition carries out demolition and site clearance nationwide.

The main areas we cover are:

  • Newport
  • Redding
  • Cardiff
  • Southampton
  • Taunton
  • Oxford
  • Exeter
  • Birmingham
  • Swindon
  • Newbury

Get in touch


Aldermoor Way,
Longwell Green,
Bristol, BS30 7EU

T: 01179 600 000
E: enquiries@bath-demolition.co.uk