Brunswick Gate, Southampton
Bath Demolition, working as Principle Contractor, carried out large-scale strip out works to enable the redevelopment of an existing office space.
Due to the site being in proximity to the city centre, extra care was taken to ensure the safety of members of the public. Protective heras type fencing was erected around the site boundary and inspected on a regular basis to ensure no unauthorized persons could gain access to the site. A system of continuous monitoring of the surrounding traffic was also put in place and deliveries and collections were carried out outside of the peak times to help reduce congestion.
Partial demolition of the basement was carried out following the initial strip out. A 3 tonne excavator was utilized with a breaker and dust suppression system put in place.
A full R&D survey was carried out prior to the start of works and asbestos materials identified were removed in a controlled manner by a licenced contractor and taken to a licensed waste facility.
Bath Demolition carried out these works in within the clients scope and budget.